Skip to main content

Site Navigation

Your Account

Choose Language

Help

Step Type:

Drag to rearrange

Zip-tie the cables and PTFE tube from the effector at equal intervals and route them to the RAMPS board in the bottom frame.

Zip-tie the extruder/hot-end/endstop cables at the base of the Z-tower and divide the cables, routing the fan, Z-probe, thermistor and Z-endstop cables along the Y-Z channel and the motor and hot-end resistor cables along the X-Z channel - these can only go as far as the Z-probe retractor. Zip-tie in place and route into the base of the printer.

Fit spool holder to the top frame between Y and Z tower.

Connect the two flat cables with the LCD screen and assemble the screen, frame and the two LCD panel holders with the help of 4 M3x16 screws.

Note which of the cables is EXP1 and which is EXP2!

Your contributions are licensed under the open source Creative Commons license.