-
-
Fit an M3x8 screw and t-slot nut to each top bracket loosely and slide the top frame onto the towers so that the hexagonal nut holes are facing down! Align the t-slot nuts so they slide into the channels.
-
Once all 3 corners are fully onto the tower profiles, push them further down until they are flush against the endstops and 10-20mm of the profile is protruding above each bracket. Do not tighten the M3x8 screws yet!
-
Fit an M3x35 bolt with washer into the angled belt tensioner hole in the top of each bracket.
-
Fit an M3 nut onto each bolt from underneath and tighten just enough to draw it into the nut trap without raising the bracket on the pillar.
-
-
-
BEFORE tightening any of the screws on the top frame, loop the three timing belts over the flanged bearings in the top frame, between a pair of rods...
-
...down and around the GT 2 pulleys in the bottom frame.
-
Once the belt is loosely looped over the bearings and pulleys, pass the belt through the grooves of the carriage, around the top fixing peg on the carriage from right to left.
-
-
-
Make sure the M3x8 screws holding the top brackets in place are still loose on the towers! Now tighten the M3x35 belt tensioner screws until the belts are all equally tight and make a low twanging note when plucked.
-
Once the belts are tensioned to your satisfaction, only then tighten all the M3x8 screws on the top frame.
-
Cancel: I did not complete this guide.
One other person completed this guide.